154 kV Power Transmission Line (EDH) Survey, Project Design, and Installation cover the entire planning and implementation process of lines established for the transmission and distribution of electrical energy at the high-voltage level (154,000 V).
This process;
1.) The determination of the route of the line (survey)
- Examination of the structure of the land, the existing line, and analysis of structures
- Technical and economic analysis
- Feature material and workmanship approach
2.) And accounts to be made of the necessary technical drawing (PROJECT)
- Single line diagram
- Profile drawings
- Direct the placement of the poles and the type of plans
- Conductors, insulators and equipment selection
- Mechanical protection voltage and accounts
- Preparation of Bill of quantities.
3.) The construction of the field (PLANT)
- Direct planting,
- Travers, insulator and installation of equipment,
- Conductor and earth wire shot, ground operations,
- Finally, the line includes testing and commissioning.
SETA Enerji Mühendislik all of our work since 2005; the line is safe, efficient and regulations in order to ensure that it is commissioned in accordance with the relevant legislation and technical standards within the framework of realizing meticulously.